48 MW
Estimated Capacity

Ownership & Power

  • Developer KDDI

Compute Infrastructure

  • GPU Model NVIDIA GB200 NVL72

Data Confidence & Evidence

    Verified Project

Analyst Notes

Opened 2026-01-22 on part of Sharp's former Sakai LCD plant (KDDI bought its parcel for ~JPY10bn/US$68m in April 2025; GB200 NVL72 racks, direct liquid cooling, 100% renewable power). Distinct from SoftBank's separate 150MW project on the larger portion of the same Sharp Sakai site (already covered). 48MW is facility capacity as reported at launch; IT-vs-total basis not broken out. CORRECTION 2026-08-01: operations since 2026-01-22 are primary-sourced (KDDI), but the 48 MW figure appears only in trade press and describes facility capacity, not critical IT load. Reclassified from confirmed operating to an estimate accordingly.

Project Information

  • Project Type AI FACTORY
  • Lifecycle Stage Operation
  • Status OPERATIONAL
  • Country Japan
  • State / Region Osaka Prefecture
  • City Sakai, Osaka

Ownership

  • Ticker 9433.T

Location