Project Overview

Anchor site of the Stargate programme in Abilene, Texas, operated by Oracle with OpenAI as tenant.

Project Metrics

1,200 MW
Estimated Capacity

Ownership & Power

  • Developer Oracle
  • Power Source Grid + on-site gas turbines

Compute Infrastructure

  • GPU Model NVIDIA GB200 NVL72

Project Timeline

Jan 21, 2025

Project announced

Dec 31, 2026

Expected opening

Data Confidence & Evidence

  • Confidence Score 64/100

Analyst Notes

Gas turbines rated up to ~300 MW are reported on site, bridging the gap while grid capacity is built. CORRECTION 2026-08-01: the previous 300 MW confirmed figure was Epoch's April total-facility-power estimate, which Epoch itself revised. Oracle stated 'In Abilene, 200MW is already operational' (April 2026) — that operator statement is what the confirmed column now carries. Epoch's live directory estimates 421 MW IT across Buildings 1–4 (May 2026), projecting 843 MW / all eight buildings by ~November 2026; recorded as a separate estimate. OpenAI capped the site at 1.2 GW in March 2026.

Project Information

  • Project Type AI FACTORY
  • Lifecycle Stage Commissioning
  • Status PARTIALLY OPERATIONAL
  • Country United States
  • State / Region Texas
  • City Abilene