Project Metrics

300 MW
Estimated Capacity
230,000
Confirmed GPUs

Ownership & Power

  • Developer xAI

Compute Infrastructure

  • Confirmed GPU Count 230,000
  • GPU Model NVIDIA H100/H200 + ~30,000 GB200

Project Timeline

Jun 05, 2024

Project announced

Data Confidence & Evidence

    Verified Project

Analyst Notes

Original Colossus at the former Electrolux plant, operational since 2024. 300 MW is facility power consumption for the completed Phase 2 buildout, not on-site generation (the site separately has ~150 MW of Megapack buffering and gas turbines). 2026 reporting says Colossus 1 now serves inference while training moved to Colossus 2. CORRECTION 2026-08-01: the 300 MW previously shown as confirmed was Tom's Hardware's Phase 1+2 consumption target, wrongly attributed to a Musk statement that covered only the GPU count. Documented power: 150 MW grid interconnection energized May 2025 (MLGW/TVA), a further 150 MW approved February 2026 (energization unconfirmed), and ~247 MW of permitted on-site gas generation. The 230,000-GPU figure is primary (Musk, July 2025) and stands. Recent reporting has Colossus 1 shifted to inference duty.

Project Information

  • Project Type AI FACTORY
  • Lifecycle Stage Operation
  • Status OPERATIONAL
  • Country United States
  • State / Region Tennessee
  • City Memphis

Location

Back to Results