Project Overview

Training cluster spanning Memphis, Tennessee and Southaven, Mississippi, generating power on site rather than waiting for utility interconnection.

Project Metrics

2,000 MW
Estimated Capacity
440,000
Estimated GPUs

Ownership & Power

  • Developer xAI
  • Power Source On-site generation

Compute Infrastructure

  • Estimated GPU Count 440,000
  • GPU Model NVIDIA GB200/GB300

Project Timeline

Jun 02, 2025

Project announced

Dec 31, 2027

Expected opening

Data Confidence & Evidence

  • Confidence Score 52/100

Analyst Notes

On-site generation is the defining feature: the site sidesteps the interconnection queue, which is why its timeline is faster than grid-dependent peers. CORRECTION 2026-08-01: the 2 GW figure is Musk's claimed total site capacity after the third-building purchase (Dec 2025), not current capacity — Epoch estimates 946 MW IT operating (Aug 2026), projecting 1,531 MW by Q1 2027. The prior 555k GPU figure was an Introl estimate; Musk's own statement was 550k GB200/GB300s as a first batch, and Epoch estimates ~440k Blackwell chips installed, which is now recorded.

Project Information

  • Project Type GPU CLUSTER
  • Lifecycle Stage Construction
  • Status UNDER CONSTRUCTION
  • Country United States
  • State / Region Tennessee
  • City Memphis

Location