Project Overview

Atlanta campus paired with the Wisconsin Fairwater site over dedicated fibre to operate as one distributed training system.

Project Metrics

636 MW
Estimated Capacity

Ownership & Power

  • Developer Microsoft
  • Power Source Grid

Project Timeline

Sep 01, 2025

Project announced

Mar 31, 2026

Expected opening

Data Confidence & Evidence

  • Confidence Score 58/100

Analyst Notes

Paired with the Wisconsin site; the two are reported to operate as a single distributed training fabric. UPDATE 2026-08-01: the 350 MW figure was the building-1 floor at the November 2025 launch. Epoch now estimates 636 MW IT with buildings 3 and 4 operational by June 2026. Microsoft's own materials still state no megawatt figure, so this is an analyst estimate, not confirmed capacity.

Project Information

  • Project Type AI FACTORY
  • Lifecycle Stage Commissioning
  • Status PARTIALLY OPERATIONAL
  • Country United States
  • State / Region Georgia
  • City Atlanta