Project Metrics

2,000 MW
Estimated Capacity

Ownership & Power

  • Developer Poolside

Project Timeline

Oct 15, 2025

Project announced

Data Confidence & Evidence

Analyst Notes

2GW campus on 568 acres of the Mitchell family's Longfellow Ranch, gas-rich Permian Basin site. CoreWeave was anchor tenant (15-yr lease, 250MW first phase expandable to 500MW, planned 40,000+ GB300 NVL72 GPUs) but the deal was mutually terminated in early 2026; Poolside approached other clouds incl. Google ('Google is no longer in talks with Poolside'). Power figure is planned gross site power, none operating. CORRECTION 2026-08-01: the CoreWeave anchor lease was terminated in late March 2026 after Poolside's ~$2B raise failed to close; the site sits idle. A scaled-down ~400 MW revival with Google was mooted and those talks have gone quiet. The 2 GW figure remains the announced campus plan only; PAUSED removes it from the credible pipeline.

Project Information

  • Project Type HYPERSCALE CAMPUS
  • Status PAUSED
  • Country United States
  • State / Region Texas (Pecos County)
  • City Fort Stockton (Longfellow Ranch)

Location

Back to Results
100% Source-Cited Data
Neutral & Independent
Built for the Public Good
Secure & Privacy Focused
Transparent Methodology